church-paving-2012-08-11_14

City officials say the construction project to repave Church Street, rebuild its sidewalks and add a protected bike lane is right on schedule.

City Engineer Sat Nagar says the work is “going great” and the contractor working on the project is expected to be finished with work on the sidewalks on the south side of the street, from Ridge to Chicago avenues, by Aug. 31.

Work on the north side of street is expected to start Aug. 27, with the full project to be completed by mid-October.

Top: Last Saturday the old sidewalk had been ripped out along the Church Street side of the 909 Davis building. Above: By this morning a worker was hosing down the new concrete for a portion of the walk.

Nagar says the contractor is taking steps to minimize inconvenience to merchants and shoppers as the work continues and that at least one lane of auto traffic on Church Street will remain open during the project, which began Aug. 1.

Related story

Church Street paving project starts today in Evanston (8/1/12)

Bill Smith is the editor and publisher of Evanston Now.

Join the Conversation

1 Comment

  1. Church Street businesses are suffering

    Businesses are hurting on Church Street due to this construction project.  Needs to move faster.

Leave a comment
The goal of our comment policy is to make the comments section a vibrant yet civil space. Treat each other with respect — even the people you disagree with. Whenever possible, provide links to credible documentary evidence to back up your factual claims.

Your email address will not be published. Required fields are marked *